Paving

What to have ready when you book paving

Oscar asks for the run length before promising a paving crew. Days below assume one crew and a clear site.

Oscar does not guess the job. On a paving call, the useful facts are the footage, the material, and whether the site is open to a crew. Those notes are what the local company sees before they call the customer back.

A safety issue on the line, or a crew already mobilized nearby, means take the sooner day. The paving line tool uses the same two numbers Oscar asks for, so the window on the board matches the conversation.

Open the paving line tool · Austin